A new bridge is built over the Lizard Creek to connect the trails on The Cedars property to the ones planned on the Galloway Lumber side. The sponsorship by the Teck company allowed for the contruction of the timber covered steel and concrete structure.
- Phase 2 of the EVNC trails
- Warming Hut construction